Planet Gear Gear Ring Sun Gear Planetary Reduction Gear Set for Drone and Robot
Overview Package size per unit product 0.60cm * 0.60cm * 0.01cm Gross weight per unit product 0.120kg Lead Time 3 days (;
Basic Info
Model NO. | ABOOM-G8 |
Manufacturing Method | Rolling Gear |
Toothed Portion Shape | Double Helical Gear |
Material | GB/C45 Steel |
Type | Bevel Gear |
Modulus | 0.5 |
Number of Teeth | 100 |
Pressure Angle | 20 Degrees |
Dividing Circle Diameter | 50mm |
Surface Treatment | Black Oxide Coating |
Tooth Accuracy | ISO/GB Grade 8 |
Allowable Error | +-0.1mm |
Transport Package | Standard Ocean Packaging |
Specification | OD55MM |
Trademark | ABOOM |
Origin | China |
HS Code | 848340 |
Production Capacity | 500000 Pieces/Years |
Packaging & Delivery
Package size per unit product 0.60cm * 0.60cm * 0.01cm Gross weight per unit product 0.120kg Lead Time 3 days (1 - 1 Pieces)5 days (2 - 10 Pieces)
7 days (11 - 50 Pieces)
To be negotiated ( > 50 Pieces)
Product Description
Product Description
Planetary reduction gear set for drone and robot
Detailed Photos
Product Parameters
Type | Ring Gear |
Material | 45#,C8620,SUS304,20CrMnTi etc. |
Treatment | Heat treatments, Carburizing, Polishing |
Standard | ISO 8 |
Delivery Date | 3 days for samples(1-20pcs), 10 days for production(100-500pcs) |
Our Advantages
Our Product Range
Material | Carbon Steel | SAE1020, SAE1045, Cr12, 40Cr, Y15Pb, 1214L. |
Alloy Steel | 20CrMnTi, 16MnCr5, 20CrMnMo, 41CrMo, 17CrNiMo5... | |
Brass/Bronze | HPb59-1, H70, CuZn39Pb2, CuZn40Pb2,C38000, CuZn40 | |
Machining process | Gear Hobbing, Gear Milling, Gear Shaping, Gear Broaching, Gear Shaving, Gear Grinding and Gear Lapping | |
Module | 0.5 | |
Tolerance control | Outer Diameter: ±0.005 mm | Length Dimension:±0.05 mm |
Teeth accuracy | ISO/GB Class 8 | |
Heat treatment | Quenching & Tempering, Carburizing & Quenching, High-frequency Hardening, Carbonitriding... | |
Surface treatment | Blacking, Polishing, Anodization, Chrome plating, Zinc plating, Nickel plating... |
a) Dimension report
b) Profile report
c) Chemical treatment report
d) Material certificate
Delivery Time
Samples: | |
Samples quantity | 1-10pcs |
Samples delivery date | 3 days |
Mass Orders: | |
100pcs -500pcs | 10 days |
500pcs-1000pcs | 20 days |
5Kpcs | 25 days |
Packaging: | |
Inner packing | Blister box |
Outer Packing | Standard cartons |
The existing equipment includes:
Imported gear grinders, CNC gear shapers, imported machining centers, imported CNC lathes, CNC grinders, and CNC gear orientation detectors, etc.
You may also like
Send inquiry
Send now